화학공학소재연구정보센터
Desalination, Vol.202, No.1-3, 293-301, 2007
An integrated wastewater treatment and reuse concept for the Olympic Park 2008, Beijing
In a Sino-German research project, a joined developed sustainable water reclamation concept was developed for different applications of municipal water reuse at the Olympic Green 2008. The concept combines advanced technological processes like membrane bioreactors, specific phosphor-us (P) adsorption columns and ultrafiltration (UF) with nature-based treatment processes like wetland and bank filtration mechanisms. The project's approach is not only to comply with the reclamation requests of the Olympic Green 2008, but also to give an example for better, adapted and energy efficient reuse applications throughout China. The study shows that fixed-bed granular ferric hydroxide (GFH) adsorbers after a membrane bioreactor (MBR) can maintain a total phosphor-us (TP) concentration of < 0.03 mg L-1. A low P concentration will be necessary to control eutrophication in the artificial Olympic Lake filled with treated wastewater. With an adsorption capacity of approx. 20 mg g(-1) d.m. at a corresponding equilibrium concentration of 1 mg L-1 P, GFH reaches long operation times and can be repeatedly regenerated by caustic solutions with an efficiency of 50%. Apart from scenic impoundments, treated wastewater will be used for irrigation and toilet flushing. The latter requires a superior quality that will be delivered by low pressure UF treatment after lake (bank) filtration. A crucial reduction of fouling potential for dead-end UF is expected.