화학공학소재연구정보센터
Biomass & Bioenergy, Vol.30, No.12, 1043-1052, 2006
Productivity and costs of slash bundling in Nordic conditions
The number of slash bundlers and the volume of slash bundling have been rapidly increasing during the last few years in Finland. However, no comprehensive time or follow-up studies have been carried out on slash bundling technology in Finland or in any other country. Metsateho Oy carried out studies on the productivity and costs of slash bundling in different Nordic recovering conditions. The study methods included both time and follow-up studies. Data were collected during the summer and winter period primarily in Norway spruce (Picea abies L. Karst.) dominated clear cutting sites. The bundling techniques performed by different types of bundler (Fiberpac 370, Timberjack 1490D, Pika RS 2000, Valmet WoodPac) were studied. The average productivity of slash bundling was 18.1 bundles per operating (E-15, including delays shorter than 15 min) hour with the Timberjack 1490D and Fiberpac 370 bundlers in the follow-up study. The operator of the slash bundler had the greatest effect on the productivity of bundling. The prerequisite for increased bundling volumes is a reduction in the costs of the most expensive sub-stage of the bundling supply chain, i.e. bundling itself. This requires improved recovery conditions at bundling sites, increased bundling productivity, larger sized bundles, and the execution of bundling operations in two work shifts using an efficient bundler and effective operator working methods. Implementation of these development measures will bring the bundling supply chain up to a speed that makes it the most competitive supply chain for forest chips in terms of total supply costs for long-distance transportation distances of more than 60 km. (c) 2006 Elsevier Ltd. All rights reserved.