화학공학소재연구정보센터
Bioresource Technology, Vol.191, 271-280, 2015
Performance and enhanced mechanism of a novel bio-diatomite biofilm pretreatment process treating polluted raw water
A lab-scale novel bio-diatomite biofilm process (BDBP) was established for the polluted raw water pretreatment in this study. Results showed that a shorter startup period of BDBP system was achieved under the completely circulated operation mode, and the removal efficiencies of nitrogen and disinfection by-product precursor were effective at low hydraulic retention time of 2-4 h due to high biomass attached to the carrier and diatomite. A maximum NH4+-N oxidation potential predicted by modified Stover-Kincannon model was 333.3 mg L (1) d (1) in the BDBP system, which was 4.7 times of that in the control reactor. Results demonstrated that the present of bio-diatomite favors the accumulation of functional microbes in the oligotrophic niche, and the pollutants removal performance of this novel process was enhanced for polluted raw water pretreatment. (C) 2015 Elsevier Ltd. All rights reserved.