화학공학소재연구정보센터

Hydrocarbon Processing

Hydrocarbon Processing, Vol.90, No.12 Entire volume, number list
ISSN: 0018-8190 (Print) 

In this Issue (34 articles)

7 - 7 Enterprise Products' $1.5 billion, 270-mile Acadian Haynesville
Thinnes B
7 - 7 In side-by-side performance, durability and emissions testing of
Thinnes B
7 - 7 Germany's decision to phase out nuclear power in light of the
Thinnes B
7 - 7 Technip has signed a strategic partnership agreement for innovation
Thinnes B
7 - 7 Risk-management services firm DNV recently issued the world's first
Thinnes B
7 - 7 Foster Wheeler's Global Power Group subsidiary has entered into a
Thinnes B
7 - 7 BP fined $50 million
[Anonymous]
9 - 10 Spare parts availability and the need for non-OEM options
Bloch HP
13 - 13 Asset-intensive organizations require good asset information management
Snitkin S
15 - 15 US investment in GHG mitigation technologies
Thinnes B
16 - 16 US welding equipment demand to exceed $7 billion
[Anonymous]
16 - 16 Saudi petrochemical executives host meeting with senior Chinese official
[Anonymous]
19 - 24 HPI Market Data 2012 Executive Summary
[Anonymous]
25 - 26 Catalytic direct oxidation for sulfur recovery
[Anonymous]
25 - 25 Optimize low TOC range monitoring
[Anonymous]
25 - 25 Fast validation and calibration.
[Anonymous]
25 - 25 TOC or TC?
[Anonymous]
25 - 25 Reducing response time.
[Anonymous]
25 - 25 Optimal sample conditioning.
[Anonymous]
26 - 26 Precise and reliable oil-analysis method
[Anonymous]
26 - 26 hte engaged in research for Total
[Anonymous]
26 - 26 Scanning unit offers inside view of components
[Anonymous]
26 - 26 Material virtually eliminates sealless pump failure
[Anonymous]
35 - 38 Optimize capacity for large ethylene oxide reactors Many factors must be considered in fine-tuning unit design
Crudge B, Billig B, Schneider R
41 - 42 Selecting the right steam methane reformer: Can vs. box design Simulating various configurations and cost estimates aids in the selection of a steam methane reformer for hydrogen production
Schoerner W, Shahani G, Musich N
43 - 49 Investment roadmap: Planning for carbon capture and storage Reducing emissions can be approached the same way as any other new capital project
Ferguson S
51 - 51 Knowledge transfer: A primer for major capital projects Improve transfer strategy across the project supply chain to achieve smooth end-user takeover
Magarini A, Altamura A, Robertson R
59 - 62 Manage risks with dividing-wall column installations A simple auxiliary configuration and an extensive modeling study can mitigate the implementation risks of DWCs
Shin J, Lee S, Lee J, Lee M
63 - 66 Preserving knowledge: Keys to effective lifecycle management Plant information resides in many locations throughout the facility; capturing it is a challenge
Lippin J
69 - 76 Consider these guides for stress relieving of vertical towers
Ayari H, Truong D, Truong KT
77 - 80 Proper relief-valve sizing requires equation mastery These simple and rigorous critical-flow equations will help stem the tide of potential catastrophic failures
Kim JS, Dunsheath HJ, Singh NR
81 - 82 Enhancing pump design How modern tools accentuate pump performance
Krueger S, Cropper M, Parker J
83 - 85 Onsite water services help refinery go from idle to online Assistance enables quick return to profitable production levels
McCloskey C
90 - 90 Safety equipment qualification
Goble W