1 |
Study on guaranteed output constraints in the long term joint optimal scheduling for the hydropower station group He ZZ, Zhou JZ, Xie MF, Jia BJ, Bao ZF, Qin H, Zhang HR Energy, 185, 1210, 2019 |
2 |
Real-time optimization of a chilled water plant with parallel chillers based on extremum seeking control Mu BJ, Li YY, House JM, Salsbury TI Applied Energy, 208, 766, 2017 |
3 |
Homogenous multi-agent optimization for process systems engineering problems with a case study of computer aided molecular design Gebreslassie BH, Diwekar UM Chemical Engineering Science, 159, 194, 2017 |
4 |
Single and multiple objective optimization of a natural gas liquefaction process Song R, Cui MM, Liu JJ Energy, 124, 19, 2017 |
5 |
Penalty Functions for Handling Large Deviation of Quadrature States in NMPC Gros S, Zanon M IEEE Transactions on Automatic Control, 62(8), 3848, 2017 |
6 |
A nonlinear support vector machine model with hard penalty function based on glowworm swarm optimization for forecasting daily global solar radiation Jiang H, Dong Y Energy Conversion and Management, 126, 991, 2016 |
7 |
Strategy of changing cracking furnace feedstock based on improved group search optimization Nian XY, Wang ZL, Qian F Chinese Journal of Chemical Engineering, 23(1), 181, 2015 |
8 |
Efficient ant colony optimization for computer aided molecular design: Case study solvent selection problem Gebreslassie BH, Diwekar UM Computers & Chemical Engineering, 78, 1, 2015 |
9 |
Cuckoo optimization algorithm with penalty function for combined heat and power economic dispatch problem Mellal MA, Williams EJ Energy, 93, 1711, 2015 |
10 |
A simplified optimization model to short-term electricity planning Pereira S, Ferreira P, Vaz AIF Energy, 93, 2126, 2015 |