1 |
Optimization of water-energy nexus in shale gas exploration: From production to transmission Oke D, Mukherjee R, Sengupta D, Majozi T, El-Halwagi MM Energy, 183, 651, 2019 |
2 |
An optimization framework for scheduling of converter aisle operation in a nickel smelting plant Ewaschuk CM, Swartz CLE, Zhang YL Computers & Chemical Engineering, 119, 195, 2018 |
3 |
A multitasking continuous time formulation for short-term scheduling of operations in multipurpose plants Lagzi S, Fukasawa R, Ricardez-Sandoval L Computers & Chemical Engineering, 97, 135, 2017 |
4 |
Integrated production planning and scheduling optimization of multisite, multiproduct process industry Shah NK, Ierapetritou MG Computers & Chemical Engineering, 37, 214, 2012 |
5 |
Improved three-index unit-specific event-based model for short-term scheduling of batch plants Vooradi R, Shaik MA Computers & Chemical Engineering, 43, 148, 2012 |
6 |
Flexible maintenance within a continuous-time state-task network framework Hazaras MJ, Swartz CLE, Marlin TE Computers & Chemical Engineering, 46, 167, 2012 |
7 |
Sequential methodology for integrated optimization of energy and water use during batch process scheduling Halim I, Srinivasan R Computers & Chemical Engineering, 35(8), 1575, 2011 |
8 |
Improving unit-specific event based continuous-time approaches for batch processes: Integrality gap and task splitting Janak SL, Floudas CA Computers & Chemical Engineering, 32(4-5), 913, 2008 |
9 |
A tighter continuous time formulation for the cyclic scheduling of a mixed plant Pochet Y, Warichet F Computers & Chemical Engineering, 32(11), 2723, 2008 |
10 |
Optimal scheduling of mixed batch and continuous processes incorporating utility aspects Behdani B, Pishvaie MR, Rashtchian D Chemical Engineering and Processing, 46(4), 271, 2007 |