1 |
Three-level interactive energy management strategy for optimal operation of multiple virtual power plants considering different time scales Li N, Tan CX, Lin HY, Ma X, Zhang XC International Journal of Energy Research, 45(1), 1069, 2021 |
2 |
Bi-level optimal planning model for energy storage systems in a virtual power plant Li JH, Lu B, Wang ZB, Zhu MS Renewable Energy, 165, 77, 2021 |
3 |
Power flow management controller within a grid connected photovoltaic based active generator as a finite state machine using hierarchical approach with droop characteristics Konara KMSY, Kolhe M, Sharma A Renewable Energy, 155, 1021, 2020 |
4 |
Uncertainties of virtual power plant: Problems and countermeasures Yu SY, Fang F, Liu YJ, Liu JZ Applied Energy, 239, 454, 2019 |
5 |
A data mining-driven incentive-based demand response scheme for a virtual power plant Luo Z, Hong S, Ding YM Applied Energy, 239, 549, 2019 |
6 |
Coordinated operation of electric vehicle charging and wind power generation as a virtual power plant: A multi-stage risk constrained approach Abbasi MH, Taki M, Rajabi A, Li L, Zhang JF Applied Energy, 239, 1294, 2019 |
7 |
Bi-level multi-time scale scheduling method based on bidding for multi operator virtual power plant Kong XY, Xiao J, Wang CS, Cui K, Jin Q, Kong DQ Applied Energy, 249, 178, 2019 |
8 |
A multi-objective robust scheduling model and solution algorithm for a novel virtual power plant connected with power-to-gas and gas storage tank considering uncertainty and demand response Ju LW, Zhao R, Tan QL, Lu Y, Tan QK, Wang W Applied Energy, 250, 1336, 2019 |
9 |
Day-ahead stochastic multi-objective economic/emission operational scheduling of a large scale virtual power plant Hadayeghparast S, Farsangi AS, Shayanfar H Energy, 172, 630, 2019 |
10 |
Risk-based optimal energy management of virtual power plant with uncertainties considering responsive loads Rad AS, Badri A, Zangeneh A, Kaltschmitt M International Journal of Energy Research, 43(6), 2135, 2019 |