1 |
The production schedule optimization of a multilayer superposed CBM system: An experimental study Peng SJ, Jia L, Xu J, Zhang CL, Li QX, Han ED Powder Technology, 373, 99, 2020 |
2 |
Investigation of soiling effects, dust chemistry and optimum cleaning schedule for PV modules in Lahore, Pakistan Ullah A, Amin A, Haider T, Saleem M, Butt NZ Renewable Energy, 150, 456, 2020 |
3 |
Optimum cleaning schedule of photovoltaic systems based on levelised cost of energy and case study in central Mexico Rodrigo PM, Gutierrez S, Micheli L, Fernandez EF, Almonacid FM Solar Energy, 209, 11, 2020 |
4 |
Innovative control approaches to assess energy implications of adaptive facades based on simulation using EnergyPlus Tabadkani A, Tsangrassoulis A, Roetzel A, Li HX Solar Energy, 206, 256, 2020 |
5 |
Integrated optimal design and scheduling for a bitumen upgrader facility Purkayastha SN, Gates ID, Trifkovic M Computers & Chemical Engineering, 128, 77, 2019 |
6 |
Blending gear shift strategy design and comparison study for a battery electric city bus with AMT Lin C, Zhao MJ, Pan H, Yi J Energy, 185, 1, 2019 |
7 |
Investigation of optimal tilt angles and effects of soiling on PV energy production in Pakistan Ullah A, Imran H, Maqsood Z, Butt NZ Renewable Energy, 139, 830, 2019 |
8 |
Three-stage scheduling scheme for hybrid energy storage systems to track scheduled feed-in PV power Liang ZR, Song ZX, Wang JH, Wang X, Zhang GG Solar Energy, 188, 1054, 2019 |
9 |
Feedback Control of Proppant Bank Heights During Hydraulic Fracturing for Enhanced Productivity in Shale Formations Siddhamshetty P, Kwon JSI, Liu S, Valko PP AIChE Journal, 64(5), 1638, 2018 |
10 |
On the use of probabilistic forecasts in scheduling of renewable energy sources coupled to storages Appino RR, Ordiano JAG, Mikut R, Faulwasser T, Hagenmeyer V Applied Energy, 210, 1207, 2018 |