화학공학소재연구정보센터
검색결과 : 6건
No. Article
1 Optimal scheduling of a by-product gas supply system in the iron- and steel-making process under uncertainties
Pena JGC, de Oliveira VB, Salles JLF
Computers & Chemical Engineering, 125, 351, 2019
2 An improved plant-wide multiperiod optimization model of a byproduct gas supply system in the iron and steel-making process
de Oliveira VB, Pena JGC, Salles JLF
Applied Energy, 164, 462, 2016
3 A MILP model concerning the optimisation of penalty factors for the short-term distribution of byproduct gases produced in the iron and steel making process
Zhao XC, Bai H, Lu X, Shi Q, Han JH
Applied Energy, 148, 142, 2015
4 Gasholder level control based on time-series analysis and process heuristics
Jeong C, Chu YH, Han C, Yoon ES
Korean Journal of Chemical Engineering, 28(1), 16, 2011
5 A novel MILP model for plantwide multiperiod optimization of byproduct gas supply system in the iron- and steel-making process
Kim JH, Yi HS, Han C
Chemical Engineering Research & Design, 81(8), 1015, 2003
6 Plant-wide Optimal Byproduct Gas Distribution and Holder Level Control in the Iron and Steel Making Process
Kim JH, Yi HS, Han C
Korean Journal of Chemical Engineering, 20(3), 429, 2003